top of page

Service Interruption: September 15, 2025

  • Mia Concepcion
  • Sep 9
  • 1 min read

WHEN

Monday, September 15, 2025, 08:00 am - 05:00 pm

WHY

1. Overhead line rehabilitation activity is needed to mitigate the

occurrence of unscheduled power outage in Campo Verde.

2. Replacement of old meters to a new meter (LEZ meter).

3. Transferring of meters to new Meter on Pole set-up.

WHERE

Campo Verde Subdivision, Block 2 Lot 17, 19-23, Block 4 Lot 1-12

Block 5 Lot 1-24, Block 6 Lot 16-30, and Block 1 Prime Lot 1


bottom of page